×

供应商开发的5个步骤

消耗积分:0 | 格式:rar | 大小:433 | 2009-07-30

韩刚龙

分享资料个

供应商开发的5个步骤:Supplier Auditing (2nd Party relationship)
Final Inspection 5 step plan, or How to eliminate Wrong P/N Rejections
I noted over a period of years, a persistent reported problem in supplier defect data. One of the top 5 problems every month
was related to incorrect part marking. The rejection may have been called ‘wrong part received’, ‘wrong part number sent’,
‘wrong PO number’, ‘paperwork does not match part’, or other. This rejection category was often the #1 supplier defect
month-to-month, it was always in the top 5, and was typically the #1 defect code when data was totaled for the year. It did
not matter what quality system was in place at the suppliers (ISO, QS, MIL, or other) if a supplier had the problem at all it
was typically a repeat problem.

声明:本文内容及配图由入驻作者撰写或者入驻合作网站授权转载。文章观点仅代表作者本人,不代表电子发烧友网立场。文章及其配图仅供工程师学习之用,如有内容侵权或者其他违规问题,请联系本站处理。 举报投诉

评论(0)
发评论

下载排行榜

全部0条评论

快来发表一下你的评论吧 !